-
E-mail
1979671839@qq.com
-
Phone
13962030990
-
Address
No. 79, Road 3, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd
1979671839@qq.com
13962030990
No. 79, Road 3, Private Industrial Park, Jianhu County, Yancheng City, Jiangsu Province
Underground sewage lifting prefabricated pump station, directly sold by Jianhu headquarters of Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd,And there is a professional team to design, manufacture, and install various specifications, models, and sizes of underground sewage lifting prefabricated pump stations.

Shijiazhuang SW large module buried fire integrated pump stationThere are three key points for implementing technical solutions:
One is to establish a comprehensive integrated non floating pump station system, which includes various parts such as buried fire water tanks, fire hydrant pump rooms, sprinkler pump rooms, channel steel profiles, connecting bolts, pits, and embedded bolts.


The second approach is to consider the anti floating buried fire pump station pit as a whole, consisting of a side wall foundation, a reinforced concrete slab foundation at the bottom, and a sand and gravel cushion layer placed under the reinforced concrete slab foundation; The third is to fasten the fire hydrant pump room and sprinkler pump room to the reinforced concrete slab foundation through embedded bolts embedded in the foundation, and place them in a stainless steel water tank. This structural design has several obvious features: firstly, the stainless steel water tank is composed of a top plate and side plates; The second is that the channel steel profile is connected to the bottom surface of the four wall side plates of the stainless steel water tank through connecting bolts, and a rubber sealing strip is provided between the two.

Thirdly, there is a concave rectangular plane on the reinforced concrete foundation of the buried fire pump station, which is longer than the length of the stainless steel water tank and wider than the width of the stainless steel water tank; Thirdly, the channel steel profile is fastened to the concave plane of the reinforced concrete slab foundation through pre embedded bolts, and a rubber sealing strip is provided between the two; The fourth is that the concave plane and concave side of the reinforced concrete slab foundation are filled with sealant between the channel steel profile, and the sealant is silicon copper sealant or silicon steel structural adhesive; The upper end of the pre embedded bolt connecting the groove steel profile and the concave plane of the reinforced concrete slab foundation is submerged in the sealant.
Shijiazhuang SW large module buried fire integrated pump station