-
E-mail
2798126271@qq.com
-
Phone
13962025986
-
Address
No. 79, Road 3, Private Industrial Park, Jianhu County
Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd
2798126271@qq.com
13962025986
No. 79, Road 3, Private Industrial Park, Jianhu County
Anti floating buried box pump integrated manufacturer supply and production according to the drawing
Our company's buried BDF finished fire water tank has the following advantages compared to concrete water tanks:
One is that the buried BDF finished fire water tank has good anti floating effect. Because the bottom plate is connected to the box body during design, the weight of the box body offsets the buoyancy of groundwater. Therefore, none of our underground box pump integrated fire pump station systems have encountered problems due to buoyancy.
Secondly, the underground BDF finished fire water tank system is well maintained, with internal reinforcement, pump stations, pipelines, sprinklers, and other components operating in the main hall without any damage, and with intelligent control;
Thirdly, the buried BDF finished fire water tank has a more sturdy structure. The planting of grass and trees, as well as the parking of cars, were not affected in any way;
Fourthly, the buried BDF finished fire water tank saves costs. Labor costs are saved by 25%, material costs are saved by 21%, and project duration is shortened by 18%.
Advantages of buried BDF finished fire water tank equipment: Space saving: This pump room can be installed in any space between 1.5-1.3 meters underground, without occupying the building area, achieving the goal of saving land and also saving a lot of money for businesses. Easy installation: Due to the use of prefabricated galvanized sheet water tanks, the previous welding method has been changed and screws have been used for assembly, making installation convenient, requiring no equipment, and having stronger applicability. Easy upgrade: There is a remote interface that supports remote transmission and automatic cleaning. Frost free cracking: The fire pump water tank is located deep inside and will not crack due to freezing in winter. Noise: The submersible motor and water pump of the equipment greatly reduce the operating noise. Reliability: Submersible motors will not burn out or corrode motor bearings due to rain or temperature. Beijing, February 16th (by Bian Liqun) - "The approval will be completed by the end of November and the establishment will be listed at the end of the year." The professional league news announced by the Chinese Football Association on the morning of the 16th has attracted attention. After three years, this organization, which marks the decentralization of the Football Association and further marketization of the league, is about to become a reality. After a sharp rise in February, it is expected that the domestic steel billet market will mainly experience price fluctuations and adjustments in March, with insufficient short-term momentum. Iron ore: Despite the continuous inventory at the port, the price of imported ore in February followed the fluctuating upward trend of steel, which exceeded the expectations of many market participants. As of the end of February, the price of Platts 62% powder ore reached $92/ton (CIF), an increase of nearly $10/ton from the end of January, and transactions for medium grade ore remained relatively active. Many domestic mines have not yet resumed production, and market resources are tight. The ex factory prices of iron concentrate powder in Hebei and Anhui have risen to 880 yuan/ton and 790 yuan/ton respectively, an increase of 90-120 yuan/ton from the end of January.
The size of the pump room is determined based on the size and quantity of the water pump units and the size of the electrical control cabinet. The main pedestrian passage of the pump should not be less than 1.2m, and the width of the passage in front of the electrical control cabinet should not be less than 1.5m. A manhole should be set at the top of the pump room, and a ladder should be arranged inside for easy maintenance.
The foundation and cushion layer are made of C15 concrete with a thickness of 150mm. The cushion layer is covered with C30 impermeable reinforced concrete and leveled. The size of the foundation should be 1000mm larger than the size of each side of the pump station. The thickness of impermeable reinforced concrete is 250mm. On February 14, when the tram market and Internet traffic both entered the stock era, most brands chose to shrink. However, Yiche went against the trend and launched a large-scale brand launch before the end of the year's booming car market to achieve further growth in user base, drive sales leads, and provide support for manufacturers and dealers' annual sales targets.
Anti floating buried box pump integrated manufacturer supply and production according to the drawing






