-
E-mail
zhouhuibing@ctel.net.cn
-
Phone
13917524241
-
Address
No. 111 Wencai Road, Shanghai
Shanghai Shangshi Era Experimental Equipment Co., Ltd
zhouhuibing@ctel.net.cn
13917524241
No. 111 Wencai Road, Shanghai
thermal shock chamberIt is a testing equipment used in the metal, plastic, rubber, electronics and other material industries to test material structures or composite materials. It can withstand continuous environmental changes of high and extremely low temperatures in an instant, and detect chemical changes or physical damage caused by thermal expansion and contraction of the sample in the shortest possible time.
Product Model |
SS-LRCJ2-400 |
SS-LRCJ3-225 |
structural approach |
Two box impact (basket style) |
Three boxes of impact |
Studio size D * W * H |
600*600*620mm |
500*600*750mm |
Basket size D * W * H |
400*400*400mm |
/ |
Nominal internal volume |
64L |
225L |
Dimensions D * W * H |
2350*1370*1950mm |
1700*2000*2200mm |
Main technical parameters |
(1) Temperature shock range: -55 ℃ to+85 ℃; (2) Temperature fluctuation: ≤± 1.0 ℃; (3) Low temperature pre cooling:+25 ℃ to -55 ℃ ≤ 45 minutes; (4) High temperature preheating: rise from+25 ℃ to+150 ℃ for ≤ 25 minutes; (5) Basket transfer time: ≤ 10s; (6) Temperature recovery time: ≤ 5 minutes. |
(1) Temperature shock range: -55 ℃ to+150 ℃; (2) Temperature fluctuation: ≤± 1.0 ℃; (3) Low temperature pre cooling:+25 ℃ to -60 ℃ ≤ 50min; (4) High temperature preheating: rise from+25 ℃ to+150 ℃ for ≤ 25 minutes; (5) Wind door switching time: 5 seconds; (6) Temperature recovery time: ≤ 5 minutes. |
meet the standard |
GB/T 2423.1-2008 Environmental testing for electrical and electronic products - Part 2: Test methods - Test A: Low temperature; GB/T 2423.2-2008 Environmental testing for electrical and electronic products - Part 2: Test methods - Test B: High temperature; GB/T 2423.22-2012 Environmental Testing Part 2: Test Methods Test N: Temperature Variation; GB/T 10592-2023 Technical Conditions for High and Low Temperature Test Chambers; If the above standards and specifications are replaced by new standards and specifications, the new standards and specifications shall be implemented. |
|
Note:thermal shock chamberNon universal standard sizes or other special temperature requirements can be consulted for customization.